The power plant has two horizontal Francis turbines with an output of 0.700 MW. In 2018 the hydraulics were overhauled and part of the concrete on the mill race was repaired. A new generation metre was supplied and installed along with a secondary metre to the local electricity supply. The power plant was connected to the monitoring centre in Brno, which means it is constantly under supervision. No significant changes were made in 2019.